by alrodopial » Thu Nov 05, 2009 7:26 pm
Hi everyone,
My answer about refresh rate with an example:
I set the refresh rate at 30 secs and I want this to change into 5 secs one minute before the official off (smaller refresh rate close to the off). So I place 30 or 5 in Q2 lets say with a macro.
An update was done at 1:15 before the off (75 secs), next update is 45 secs before the off and all the others I want them to be done every 5 secs.
BA will refresh correctly at 1:15 and 45 secs but after this it will update after another 30 secs (at 15 sec before off) and then every 5 secs. That's because BA gets the value from Q2 directly, without 'letting' excel perform any calculation (from macros or formulas). My logic tells me that It should have let excel calculate the new value in Q2 and then use this new value.
How can anyone bypass this 'problem' ?
Is there a 'technical' problem and you were 'forced' to adapt this approach?
Thanks